Sewage Water Separation Site

Location:  In front of the A building, lake side, right in front of the cafeteria




Project description: Sewage Water Separation / Greening the Palais des Nations
 Project duration: April 2014 - September 2014
New Design of the S 6 (Court Room)
Location: S (K) Building, 1rst floor

Project Description: Design for a new courtroom for United Nations Court. 






The design was developed by the Building Unit in close collaboration with the Technical Services for audio and electronic equipment.
Project Duration: September 2013 - February 2014 (Inaugaration)
Sewage water separation at the Palais des Nation

Location: In front of the A Building. Construction site started near Building C, continuing to Building B (crossing the big lawn in front of the cafeteria).






Project description: In order to improve the sewage water separation for the Palais, rain water and sewage water are separated. New tubes are being installed.


Duration: April 2014 - September 2014